NO
Employer
Subject of the contract
41
Pars Petrochemical Company
Lightning Protection System Design for Storage Tanks

Lightning Protection System Design for Storage Tanks of the EBSM Unit

42
Pars Petrochemical Company
Fire Protection System Design for Gasoline Loading Arm

Fire Protection System Design for Gasoline Loading Arm

43
Pars Petrochemical Company
Fire Protection System Design

Fire Protection System Design for C10 Warehouse

44
Pars Petrochemical Company
Sprinkler System Design Studies

Sprinkler System Design Studies for Terrace Warehouses 2 and 3

45
National Iranian Oil Company (NIOC)
Determination  of safe zone of Pipelines, Facilities, and Wells (Onshore Sector)

HSE Consultancy Services for Determination  of safe zone of Pipelines, Facilities, and Wells (Onshore Sector)

46
Hormozgan Provincial Gas Company
Safety and Firefighting Standard Operating Procedures (SOPs)

Preparation and Development of Safety and Firefighting Standard Operating Procedures (SOPs)

47
Exir Sazan Atlas Company
including Consequence Modeling and Risk Assessment

Consultancy Services for Standard Equipment Siting in a New Plant Area, including Consequence Modeling and Risk Assessment

48
Alinam Company
Consequence Modeling

Consequence Modeling for Abadan Refinery Flare Gas Recovery Project

49
Pars Petrochemical Company
Technical Evaluation of RCTS Proposals

Consultancy Services for Technical Evaluation of RCTS Proposals

50
Tehran Oil Refinery
Fire Risk Assessment (FRA)

Fire Risk Assessment (FRA)